GWR 850 Production February 06 2024

Corrections to the drawings are almost complete now. Production has been agreed to start next month.

I will make an inspection visit once all the frames are complete. After this construction of the bodies can commence.

The 3D cad drawing below shows part of the correction process. Blue parts have recently been altered by the designer and I have to check them and make further comments if required. The builder is very open to making any changes I require.

I look forward to posting progress pictures from the builder. 

This is the 5 panel tank Ver 1