GWR D20 Brakes and GWR 517 May 01 2017
Good progress is being made on the brake 3rds which are at the painters.
Work has started on the GWR 517 production samples covering each version. After we have checked these full production begins.
coaches in the process of being lined before the door handles etc are fitted and then the final varnish coating is a applied.
corridor connectors all assembled
coach bogies all finished
517 etches
some of the many parts pressed to shape for the 517's
rear of the riveted fronts showing that they are pressed not etched
valences
frames
bunkers
rear frames for version 1